JEOS HANDOVER COMPLETENESS CHECKER

Know what is missing before handover becomes a scramble.

Compare contractual and project handover requirements with the actual handover package to identify missing documents, incomplete evidence and unresolved sign-off requirements.

Sign in to upload your documents. New here? Signing in creates your account automatically.

EXAMPLE FINDINGS
As-built drawings MISSING
Handover requirements call for approved as-built drawings, but none are present in the uploaded package.
Training records PARTIAL
Training records are present, but client sign-off is not evidenced.
Test certificates COMPLETE
Required test certificates are present and traceable to the handover requirement.
WHAT YOU GET

A decision-ready report and a working Handover Completeness Register

A full handover review plus a structured Excel register showing each handover requirement, evidence status, source, responsibility and action.

The report includes the document relationship summary, executive summary, detailed findings, missing information, prioritised actions and final assessment. The Excel workbook is generated from the same analysis.

Check the handover package against what the project actually requires

JEOS analyses the relationships between your documents rather than treating every file as an isolated summary.

1

Upload related documents

Add the contracts, scopes, specifications, proposals, registers, revisions or other project documents relevant to the review.

2

JEOS maps requirements to evidence

JEOS extracts handover obligations and checks the uploaded records for matching documents, approvals, certificates and completion evidence.

3

Review missing evidence and sign-off gaps

See what is complete, partial, missing or unverifiable, together with the source requirement and required action.

What can it find?

✓Required handover documents, certificates and records
✓Missing or partially complete evidence
✓Source-to-evidence traceability
✓Unclear handover ownership and responsibility
✓Approval, sign-off and completion gaps

Useful for

Contract ↔ Handover Pack
Specification ↔ Certificates
Deliverables ↔ Final Records
Commissioning ↔ Evidence
Requirements ↔ As-builts
Scope ↔ Completion Pack

Handover problems are much easier to fix before the final review.

Check the package against the actual requirements and focus the team on what is still missing.

Check Handover Completeness